1. Drawing/standard confirmed
2. Processing designed & confirmed
3. Control method confirmed
4. Quotation
5. Sampling tracked by QC/Engineer
6. Established inspection process
7. Final inspection & recording data. Including
ü Material checking/ raw material certs
ü Full dimensional
ü Physical testing
ü Finish testing
ü Function or mock up checking
8. Packaging
9. Submit sample or mass production shipped
Assistant quality control (per guest’s requirements)
1. PPAP/SPC/MSA
2. AQL
3. 3rd party double testing/inspection (CNAS organization as first option)